HomeLife Frontier Realty Inc., Brokerage Joonghyun Ahn, Sales Representative

Group: Pre-construction and new homes

Tarion warranty타리온 (신축 주택 보증)

In one sentence

The organization that administers Ontario’s new home warranty. The builder gives the warranty and Tarion backs it: deposit protection and delay compensation before move-in, and 1-, 2- and 7-year defect coverage after.

Last checked Oct 31, 2026

What is it?

Tarion is the not-for-profit organization that runs Ontario’s new home warranty program under the Ontario New Home Warranties Plan Act. The Ontario government gave it this job. The CAO guide describes Tarion as an "independent not-for-profit consumer protection organization established by the Ontario government to administer the province’s new home warranty program".

The key point is that the warranty comes from the builder (the "vendor" or "builder"). The law makes every builder who sells a new home warrant that it is properly built, and Tarion runs a "guarantee fund" that backs the builder up if it does not honour the warranty. So you report a problem to the builder first, and claim from Tarion if it is not fixed.

Tarion is not the builder, and it does not license builders. Builder licensing and the code of ethics belong to the HCRA. An April 2026 HCRA resource puts it simply: builder conduct issues go to the HCRA, warranty claims and construction defects go to Tarion.

Which homes are covered?

New homes built by an HCRA-licensed builder: detached and semi-detached houses, townhouses, condo units and their common elements, and "contract homes" that a builder builds on land you already own. Coverage begins when you sign the Agreement of Purchase and Sale, stays with the home if it is sold, and lasts up to seven years from possession.

A home you build yourself (an owner-built home) is not covered. Residential condo conversions (an existing building turned into condos) whose first agreement was signed on or after January 2018 are covered, but the pre-existing elements are excluded from the one-year workmanship and materials warranty.

The disclosure statement for a new condo must say whether the property will be enrolled in the warranty plan (Condominium Act, s. 72 (3) (f)). If you buy a resale home less than seven years old, the HCRA directory shows the remaining warranty.

After you move in: 1, 2 and 7 years

PeriodWhat is covered (from the date of possession or occupancy)
1 yearDefects in work and materials, Ontario Building Code violations, the home being fit to live in, and unauthorized substitutions of materials
2 yearsWater penetration through the basement or foundation walls, exterior cladding (brick, siding) that detaches or deteriorates, defects in the electrical, plumbing and heating systems, Building Code violations that affect health and safety, and water penetration into the building envelope
7 yearsMajor structural defects: failure or weakening of a load-bearing element, or a defect that makes a significant part of the home unusable

Normal wear and tear, shrinkage from drying, condensation from poor ventilation, changes made by the owner, materials the owner supplied and appliance failures themselves are excluded (Act, s. 13 (2)). See "What is not covered" on Tarion’s site for the full list.

How much is the coverage limit?

The limits depend on the date the first Agreement of Purchase and Sale in the project was signed. For agreements signed on or after July 1, 2023, the maximum is $400,000 for a freehold home, $300,000 for a condo unit, $100,000 per unit up to $3,500,000 for condo common elements, and $50,000,000 for a whole condo project (units plus common elements). Damage from environmentally harmful substances is capped at $50,000.

For agreements signed between February 1, 2021 and June 30, 2023, the freehold limit is also $300,000, and for earlier agreements the common-element limit is $50,000 per unit up to $2,500,000.

If a warranty repair makes the home unlivable, the builder is expected to pay temporary relocation costs of up to $150 a day to a maximum of $15,000 (Temporary Relocation Warranty).

Before you move in, part 1: deposit protection

If the deal does not close because the builder goes bankrupt or fundamentally breaches the contract, or because you used a statutory right to cancel (for example the 10-day condo cooling-off period), and the builder does not refund your deposit, Tarion’s guarantee fund pays. Since January 2018 this includes money paid for upgrades and extras. Money paid to "hold" a home before the contract is signed is not protected.

Condo units: under the Condominium Act, deposits must be held in trust (by a trustee or the builder’s lawyer, not by the builder itself). If the builder ends the agreement, it must refund the deposit in full within 10 days. If the builder does not return your deposit, Tarion protects it up to $20,000. Tarion advises talking to a lawyer before treating the agreement as terminated.

Freehold homes: for agreements signed on or after January 1, 2018, deposits are protected up to $60,000 if the price is $600,000 or less, and up to 10% of the price (maximum $100,000) if the price is over $600,000.

From April 1, 2026, freehold buyers must register their purchase with Tarion within 45 days of signing to qualify for the maximum coverage. Those who register late or not at all are paid from a separate fund of $15,000,000 a year, shared out proportionally if claims exceed it. Tarion has said it will defer this change to coverage until January 1, 2027. A lawyer or agent can register for you. Condo and contract-home buyers do not have to register.

Before you move in, part 2: delay compensation and the Addendum

Every new home agreement must have the Addendum developed by Tarion and the HCRA attached. Its first page is the Statement of Critical Dates, which both sides sign, setting a tentative or firm occupancy (condo) or closing (freehold) date and an outside date. If the Addendum conflicts with anything else in the agreement, the Addendum wins.

The builder may extend dates under the rules (normally 90 days’ written notice), but if a firm date is missed it must pay delayed closing or occupancy compensation of $150 a day for living expenses, up to $7,500. Real costs such as moving and storage can be added with receipts, and if the builder gives less than 10 days’ notice of a delay, $1,500 ($150 × 10 days) is added. "Unavoidable delays" such as strikes, fires and pandemics are exceptions.

If the outside date is missed, you have 30 days to terminate the agreement and get all your money back with interest. Claim delay compensation from the builder within 180 days of your closing or occupancy date (or termination), and from Tarion during the first year of possession if the builder does not pay.

For a contract home (a builder builds on your land) there is no delay compensation; instead, if the builder fails to substantially finish the contract, financial loss compensation of up to $40,000 is available.

How do you make a claim?

  1. At the pre-delivery inspection (PDI), record every scratch, missing item and thing that does not work on the PDI form and get a copy. You also receive the Certificate of Completion and Possession (CCP), which shows the start date of your warranty.
  2. When a problem appears, tell the builder in writing within the warranty period. Tarion encourages homeowners to raise issues in writing as soon as possible.
  3. If the builder does not fix it, submit a warranty form (Initial Form, Mid-Year Form, Year-End Form and so on) through Tarion’s online service (MyHome). The law says the warranty applies only to claims made within the warranty period (s. 13 (4)), so check each form’s deadline on Tarion’s website and do not miss it.
  4. Tarion gives the builder a chance to repair, and if the problem remains, a conciliation inspection decides whether the item is covered. By law Tarion must give reasons for its decision, and you can appeal to the tribunal within the set time (s. 14 (13)–(14)).
  5. Deposit and delay claims use separate forms. You provide the agreement, copies of cancelled deposit cheques and other documents, and Tarion says a claim can take up to six months to assess, longer if disputed.

Example

Example

In March 2027 you sign for a new freehold townhouse in Richmond Hill at $950,000 and pay a $95,000 deposit. Your lawyer registers the purchase with Tarion two weeks after signing, so your deposit protection limit is 10% of the price, $95,000. The firm closing date in the Statement of Critical Dates is September 15, 2028, but the builder hands over the home on October 20, 2028 without notice. You claim 35 days × $150 = $5,250, plus $1,500 because no 10-day notice was given, for $6,750 from the builder. That is within the $7,500 cap, so the whole amount is claimable.

In month 11 after possession you find water coming through a basement wall. You notify the builder in writing and list it on your year-end form. Basement and foundation leaks are a two-year item, so you are within the warranty. When the builder does not repair it, you ask Tarion for conciliation. The amounts and dates in this example are for illustration only.

What the law and official sources say

Quotes are copied word for word. The "In plain words" lines are our explanation, not an official translation.

Ontario New Home Warranties Plan Act — The builder’s statutory warrantyOntario New Home Warranties Plan Act, R.S.O. 1990, c. O.31, s. 13 (1)
Every vendor of a home warrants to the owner, … (a) that the home, … (i) is constructed in a workmanlike manner and is free from defects in material, … (ii) is fit for habitation, and … (iii) is constructed in accordance with the Ontario Building Code; … (b) that the home is free of major structural defects as defined by the regulations;

In plain wordsWhoever sells a new home warrants by law that it is properly built, free of material defects, fit to live in, built to the Building Code and free of major structural defects.

Source: ontario.ca/laws/statute/90o31 · checked Oct 30, 2026

Ontario New Home Warranties Plan Act — Deposit compensation from the guarantee fundOntario New Home Warranties Plan Act, R.S.O. 1990, c. O.31, s. 14 (1)
Subject to the regulations, a purchaser is entitled to receive payment out of the guarantee fund for the amount that the purchaser paid to the vendor as a deposit or other payment to be credited to the purchase price under the purchase agreement on closing if, … (a) the purchaser has exercised a statutory right to rescind the purchase agreement before closing; or … (b) the purchaser has a cause of action against the vendor resulting from the fact that title to the home has not been transferred to the purchaser because, … (i) the vendor has gone into bankruptcy, or … (ii) the vendor has fundamentally breached the purchase agreement.

In plain wordsA buyer who used a statutory right to cancel, or who did not get the home because the builder went bankrupt or fundamentally broke the contract, is entitled to be paid the deposit and other price payments from the guarantee fund (within the limits set by regulation).

Source: ontario.ca/laws/statute/90o31 · checked Oct 30, 2026

Tarion — The builder provides the warranty, Tarion backs itTarion, "What is the new home warranty" — Who provides the warranty
The warranty is provided by the builder and backstopped by Tarion. As the warranty provider, the builder is responsible for resolving warranty issues directly with a homeowner. In the event that a builder fails to resolve an issue or does not feel that it is covered, the homeowner can make a claim with Tarion.

In plain wordsThe builder gives the warranty and must fix problems directly; Tarion stands behind it. If the builder does not fix an issue or says it is not covered, you can claim from Tarion.

Source: tarion.com/the-new-home-warranty · checked Oct 30, 2026

Tarion — Deposit protection amounts for freehold homesTarion, "Coverage before you close" — Deposit Protection for Freehold Homes (agreements signed on or after January 1, 2018)
If the price of the home is $600,000 or less, the purchaser’s deposit is protected for up to $60,000. … If the price of the home exceeds $600,000, deposit protection equals 10% of the purchase price up to a maximum of $100,000.

In plain wordsFor a freehold new home, the deposit is protected up to $60,000 if the price is $600,000 or less, and up to 10% of the price (maximum $100,000) above that.

Source: tarion.com/coverage-before-you-close · checked Oct 30, 2026

Tarion — Condominium deposit protectionTarion, "Coverage & claims before you move in" — Deposit protection for condominium units
Condominium unit deposits must be placed in trust under the provisions of the Condominium Act. If your purchase agreement is terminated by your builder, your deposit must be returned to you in full within 10 days. If your builder does not return your deposit, Tarion provides deposit protection of up to $20,000.

In plain wordsCondo deposits must be in trust. If the builder ends the agreement it must refund in full within 10 days, and if not, Tarion pays up to $20,000.

Source: tarion.com/node/730 · checked Oct 30, 2026

Tarion — Delayed closing compensation up to $7,500Tarion, "Freehold & Contract: coverage for closing dates & delays" — Delayed closing warranty & coverage
If closing is delayed beyond the Firm Closing Date (other than by mutual agreement or as a result of an Unavoidable Delay), then builders are required to compensate purchasers to a maximum of $7,500.

In plain wordsIf closing slips past the firm closing date (unless both sides agreed or it was an unavoidable delay), the builder must compensate the buyer up to $7,500. The same cap applies to condo occupancy delays.

Source: tarion.com/freehold-contract-coverage-closing-dates-delays · checked Oct 30, 2026

Tarion — Register within 45 days from April 1, 2026Tarion, "Coverage & claims before you move in" — Deposit protection for freehold homes
Starting April 1, 2026, new homebuyers should register their purchase agreement with Tarion within 45 days of signing to let Tarion know that they have signed an agreement and want their deposit covered. … To allow time for consumers to be aware of the changes, Tarion is implementing a transition period and will defer the changes to deposit coverage until January 1, 2027.

In plain wordsFrom April 1, 2026, freehold new home buyers should register their purchase with Tarion within 45 days of signing. The change to coverage amounts is deferred until January 1, 2027.

Source: tarion.com/node/730 · checked Oct 30, 2026

Common questions

Do I pay for the Tarion warranty?

You do not pay a premium to Tarion directly. The law makes the builder pay the fee Tarion requires (the enrolment fee) before it offers a new home for sale (Ontario New Home Warranties Plan Act, s. 10.1). Check with your lawyer whether your agreement passes that fee on to you.

Does the warranty end if the home is sold?

No. The warranty stays with the home, so if it is sold within seven years the new owner gets the remaining coverage. When you buy a resale home less than seven years old, you can check its warranty status in the HCRA directory.

The builder is not answering. Can I go straight to Tarion?

First notify the builder in writing (email) so you have a record, then submit the warranty form to Tarion within its deadline. Once you file, Tarion gives the builder a repair period, and if nothing happens it holds a conciliation inspection. Complaints about the builder’s conduct (dishonesty, bad faith) go separately to the HCRA.

Are resale homes or renovations covered?

The warranty belongs to new homes. A resale home still within seven years of its first possession date carries the rest of its coverage; after that, none is left. Renovating an existing home typically does not make it a "new home", so it is not covered. Homes you build yourself (owner-built homes) are not covered either, and homes built and sold for seasonal or temporary use are left out of the Act’s definition of "home" (Ontario New Home Warranties Plan Act, s. 1). Ask Tarion about other cases.

Who claims for defects in the condo common elements (lobby, garage)?

The condo corporation (the board), not individual owners. The corporation must have a performance audit done six to ten months after registration and submit it to Tarion before the end of the eleventh month. If you notice a common-element problem, tell the board.

What does "register within 45 days from April 2026" mean?

A buyer of a new freehold home should tell Tarion about the purchase (contact details, builder, address, deposit) through its online portal within 45 days of signing. A lawyer or agent can do it for you and it is free. Registering on time keeps the maximum deposit protection, though Tarion has deferred the change to coverage amounts until January 1, 2027. Condo buyers do not need to register.

Guides that use this term

Sources checked

  1. Ontario New Home Warranties Plan Act, R.S.O. 1990, c. O.31, ss. 1, 2, 10.1, 13, 14 (e-Laws) · checked Oct 30, 2026
  2. Condominium Act, 1998, ss. 72 (3), 81 (warranty enrolment statement, deposits held in trust) (e-Laws) · checked Oct 30, 2026
  3. Tarion, What is the new home warranty (incl. coverage limits) · checked Oct 30, 2026
  4. Tarion, Coverage for Freehold, Contract, Condo Units & Condo Conversions · checked Oct 30, 2026
  5. Tarion, Coverage & claims before you move in (deposit protection, 45-day registration) · checked Oct 30, 2026
  6. Tarion, Deposit Protection Q&A (April 2026 changes) · checked Oct 30, 2026
  7. Tarion, Freehold & Contract: coverage for closing dates & delays · checked Oct 30, 2026
  8. Tarion, Condo Units: coverage for occupancy dates, delays & cancellations (the Addendum) · checked Oct 30, 2026
  9. Tarion, The Pre-Delivery Inspection and the CCP · checked Oct 30, 2026
  10. CAO, Ontario’s Residential Condominium Buyers’ Guide, section 6 (Tarion) · checked Oct 30, 2026
  11. HCRA, Consumer Education & Resource Hub (HCRA vs. Tarion) · checked Oct 30, 2026
  12. HCRA, Do I Need a Licence? (what counts as a "new home", renovations) · checked Oct 30, 2026